Workplace Recovery Center, Bristol, UK

Services Provided

Download Workplace Recovery Datasheet


Building Features

  • 42,046 sq. ft recovery area
  • 661 seats
  • 5 customer conference rooms, office space and lounge areas
  • Customer voice recovery capabilities
  • ISO/IEC 27001:2013 backed security access controls

Address

Building 101, Longmead Road
Emerald Park East
Emersons Green
Bristol BS16 7FG

Environmental Controls

  • HVAC intelligent cooling systems
  • State-of-the-area building monitoring system
  • N+1 chiller systems
  • N+1 computer room air conditions [CRACs] including variable speed, impeller cooling system

Connectivity

  • Network connectivity with other Sungard AS facilities provides maximum flexibility
  • Meshed, multi-vendor Internet transit connectivity
  • Dual diverse and separate multi Gb ethernet links
  • Redundant internal network distribution platforms
  • 24/7 On-site network engineer for constant access

Power Management

  • Full power redundancy from N+1 up to 2N+1
  • Dual uninterruptible power systems (UPS's)
  • Catalytic reduction equipped generators
  • Branch circuit monitoring (BCM's)
  • Automated power monitoring and management

Physical Security

  • ISO/IEC 27001:2013 certified procedures and controls
  • Biometric and multi-level keyword secured
  • CCTV video and infrastructure monitoring
  • Locked cabinets and cages
  • ISO certified procedures and controls
  • 24/7 on site staffing and security service