Download Workplace Recovery Datasheet


Building Features

  • 20,700 sq. ft recovery area
  • Dedicated Suites
  • Customer conference rooms, office space and lounge areas
  • Customer voice recovery capabilities
  • ISO/IEC 27001:2013 backed security access controls

Address

6535 Millcreek Dr
Mississauga, ON L5N 2M2

Environmental Controls

  • 205-tons of HVAC (N+1) exist to cool the data centre and 60 tons (N+1) to cool the UPS room
  • Water sensors installed under raised floor area
  • Dry pre-action system in raised floor area; activated smoke or heat detector from two zones arms and floods the system and cuts power
  • 132 degree fusible sprinkler heads provide zoned dousing

Connectivity

  • Redundant multi-homed internet access
  • Redundant GigE based access to the Sungard AS global network access
  • Telecommunication service providers: Bell Canada, Allstream, Telus, Blink Communications

Physical Security

  • Geoffrey Security System
  • Quartz Halogen exterior perimeter lighting
  • Security Mantrap at main entrance to suite, security mantrap to raised floor area
  • Magnetic security sensors on all external doors
  • Vibration sensors on all windows
  • Interior and exterior surveillance cameras
  • Cardkey card access system with remote readers
  • Security access reports available
  • Security guard on-site and regular patrol service
  • Protected by Notifier – intelligent fire detection and alarm system

Power Management

  • Underground feed from Enersource Hydro Mississauga, with separate feed for dedicated MS area
  • 3,000 kVA external transformer, with separate 3,000 kVA external transformer for dedicated MS area
  • (2) 750 kVA Exide Series and (1) 300 kVA UPS
  • Dedicated MS area supported by (8) 500 kVA UPS modules
  • Diesel generator 2500 kVA, (3) 2500 kVA generators to support the MS area
  • GE Zenith automatic transfer switch and paralleling switchgear
  • Diesel tank capacity: 13,638 liters, with additional 45,000 liters to support MS area