Marlborough, MA

Marlborough Workgroup

Our data centers are open 24/7/365

Our data center in Marlborough, MA offers colocation and managed IT services 30 miles west of Boston

Our 62,000 square foot data center in Marlborough, MA features 23,000 square feet of raised floor in a semi-bunkered building design with a command center and customer conference rooms. Security features include integrated card reader system and closed-circuit TV throughout, backed by ISO/IEC 27001:2013 certification. With over 100+ miles of CAT-5 data cable, this data center offers network connectivity with other Sungard AS facilities for maximum flexibility. 

Download Data Sheet


Building Features

  • 62,000 sq. ft., total building size
  • 23,000 sq. ft. of raised floor across 3 floors
  • Building within a building design (semi-bunkered)
  • (1) individual room or command center
  • 400lb per sq. ft. raised floor load
  • Platforms supported: Remote testing command center
  • 5,000 sq. ft. of AdvancedRecoverySM space
  • Customer conference rooms
  • (1) Service elevator 7,000 lbs capacity
  • Loading dock – can support full size 18 wheelers

Address

250 Locke Drive
Marlborough, MA 01752

Environmental Controls

  • Protected by a pre-action sprinkler system – multi-zoned
  • 780-ton of Liebert cooling on the raised floors

Physical Security

  • ISO/IEC 27001:2013 certification
  • Integrated card reader security system
  • Closed circuit TV throughout the facility
  • 90 day video retention
  • Exterior security cameras
  • 24/7 security service

Connectivity

  • Network connectivity with other Sungard AS facilities provides maximum flexibility
  • 100+ miles of CAT-5 data cable
  • 2-hour fire wall surrounds entire data center
  • Sungard AS global network access
  • Net redirect – on demand DS1 & DS3
  • AT&T frame DRO
  • Verizon business frame relay PVC redirect
  • Verizon
  • Veroxity
  • LightTower – dark fiber – multi points of entry
  • ISDN BRI & PRI

Power Management

  • Redundant 13.2 utility feeds (N+1)
  • Diverse routing to sub stations
  • Supported by UPS and diesel generation
  • (4) 750 kW diesel generator (1000 kVA) (N+1)
  • Automatic transfer switch
  • Liebert SitesScan building monitoring system
  • 10,000 gallon fuel tank good for 30 hours at the current load
  • Siemens switches
  • (4) (2 A side and 2 B side) Liebert 500 kVA UPS (Both N+1)
  • (2) (1 A side and 1 B side) Liebert 1000 kVA UPS (N+1)